PP - Controlling data for your
Bill of Materials
You define the default values for BOM in OS28.
- Based quantity
- BOM Status
- Size Unit
- Var-size item unit
You control the Material type allowed for the BOM header in transaction
OS24.
In transaction OS27, you define the
central settings for your BOM management system. This
are one-time settings for BOM management, which should not be change after
production.
Low date
When you create or process BOMs, the default date is the date
defined in your system as the
earliest processing date (01/01/1900 in the standard system).
BOM validity maintenance
Tick if want the user to specify a valid-from date when maintaining
BOMs. If not tick the BOM
created as of the current date or the system low date (1/1/1990).
EC management active
Tick if you want to make historical changes to BOMs with reference
to a change number.
(This means that the status of the BOM both before and after the change
is stored in
the system.) In this step, you only specify whether engineering change
management can be
used for maintaining bills of material. In transaction OS25, Configure
history requirement
for BOMs, you define whether you want to make the use of engineering change
management a
requirement in certain cases.
Hist. reqmt variant
Use this indicator to control when history requirement applies
to new variants or
alternatives in a BOM group.
Sub-item documentn
You use the Sub-item documentation indicator to define whether
changes to sub-items are
documented.
Header
Create BOM header with parameter validity
TECHINCAL TYPE
Mult. BOM inactive
Tick if no multiple BOMs can be maintained in this R/3 system.
Variant BOM inactive
Tick if no variant BOMs can be maintained in this R/3 system
BILL OF MATERIAL ITEM
BOM item explosion type
If you create a BOM item with reference to a change number and
change the valid-from date
(in the change header or alternative date), then this can change the sequence
of validity
periods of a BOM item. The indicator BOM item explosion type specifies
whether and according to what rules,
the system determines a unique change status, when you display, evaluate
or change a BOM to
a date in the overlap period.
Description variable-sized item
This indicator controls which text is displayed in BOM processing
for a variable-sized item.
Repeated effectivity via external item ID
This indicator ensures that an item that already exists under
an external item ID can be used.
General settings
Unit 'piece'
In the standard system, this field contains a unit of measure for "piece".
You can change
this unit. This unit is the base unit of measure (BOM header) or the component
unit of
measure.
Base unit of measure for:
Equipment BOM
Functional location BOM
Document structure
Standard BOM
Component unit of measure for:
Text item
Document item
Non-stock item without material master record
CAD active
If you want to maintain BOMs from a CAD system, set this indicator.
This activates an
additional field in the BOM header and BOM item, which tells you whether
the BOM header or
BOM item was maintained from a CAD system.
If you deactivate engineering change management, changes to bills of material
are not
recorded.
The modification parameters defined here apply to all BOM categories.
The following settings are made in the standard R/3 System:
1. Validity date maintenance and engineering change management are
active.
2. The current system date is the default valid-from date.
3. CAD is active.
4. Explosion type for BOM item: blank.
SAP PP Transaction Codes
Commonly
Used Tcodes in PP Module Part 1
Commonly
Used Tcodes in PP Module Part 2
Commonly
Used Tcodes in PP Module Part 3
SAP PP Books
SAP Production
Planning, Certification and Interview Questions Reference Books
SAP PP Tips
SAP PP Tips and Production
Planning/Control Discussion Forum
Best regards,
SAP Basis, ABAP Programming and Other IMG Stuff
http://www.erpgreat.com
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
All product names are trademarks of their respective
companies. The site www.erpgreat.com is in no way affiliated with
SAP AG.
Every effort is made to ensure the content integrity.
Information used on this site is at your own risk.
The content on this site may not be reproduced
or redistributed without the express written permission of
www.erpgreat.com or the content authors.
|