What is MRP group?
The MRP group is known as an organizational object that can be used to allocate special control parameters for planning to a group of materials. You can maintain MRP groups if planning control per plant is not precise enough for your requirements and you want to allocate certain material groups different control parameters from the plant parameters. Objective To define MRP Groups for the assignment of materials. Where to used MRP groups are defined with these specific control parameters and are assigned to the material in the material master record (MRP 1 screen). Example The following control parameters can be set for the total planning run:
1. Access the activity choosing one of the following navigation options: IMG Menu: Production -> Materials Requirements Planning -> MRP Groups -> Carry Out Overall Maintenance of MRP Groups (Transaction Code: OPPRC) 2. On the MRP Group screen enter the Plant field and choose Overview. 3. On the Change View “MRP Control Parameters – Material Level”: Overview screen choose New entries. 4. On the New Entries: Details of Added Entries screen, make the required entries: Field name
6. Save your entries. Result Your company MRP groups are defined. |
See also Get help for your SAP PP ProblemsSAP PP Forum - Do you have a SAP PP Question? SAP Production Planning Books
SAP PP Tips
Main Index
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
|