Explain how and when to use MDAB transaction.
At the beginning of the implementation when we are done with the organization structure (define Plant.. etc.), we have to activate the MRP in the TC: OMDU This will take care of all planning file entries for all the materials created afterwards and that are relevant for planning. If some materials are created before the activation of MRP, in that case we use this transaction MDAB, for those material to be entered in the planning file. MDAB is for creating the planning file entries in background. So when you go-live you can schedule this job and it will create planning file entries for all the material in that plant. If required you can also schedule this job to be run once
in a month to take care of all the new materials. (if you create them by
batch jobs). Also you can use this transaction along with consistency
check for the planning file MDRE
1. What do MDAB does? This creates a Planning file entry 2. Why do we run this for first time when MRP is started? As the system needs to identity what all the materials
that has to be included in the planning run.
3. Do we need to run regularly? The answer is No. Once the mrp is run the planning file entry will be removed
and again it will be populated when a stock change occurs, a sales order
gets created, etc.
Can we get a list of materials for those planning file entry is generated through background job using t-code MDAB ? You will get that list from accessing database table MDVM
or DBVM
Notes: Planning File creates all the materials relevant for the planning run. The planning run and the scope of the planning run (which materials are planned in which planning run) are controlled by the planning file. For planning file entry use the following transactions, MD20 : Create planning
file entry
All materials assigned with MRP are automatically entered in planning file entry. Depends on changes in material planning or in proposal, system will create planning file entry. When MRP run, system will consider only which materials having entry in above contents of planning file entry. After MRP run, system delete the planning file entry. And again, when material have changes like GI GR on any other demand, then system generate planning file entry again. |
|