How MRP Type In MM MRP View
1 Works
Explain how the MRP type works. MRP Type The MRP type is a key that controls the MRP procedure to be used for planning a material. The MRP type belongs to the plant-specific data (in other words, the MRP area data of a material). The MRP type controls which planning parameters must or can be entered when maintaining the material master record. You can customize the parameters of the MRP types delivered with SAP R/3 according to your own requirements. You can also add new MRP types. MRP Type From SAP Help Menu Key that determines whether and how the material is planned. You have the following options: - Manual reorder point planning - Automatic reorder point planning - Forecast-based planning - Material requirements planning with forecasts for unplanned consumption - Master production scheduling (MPS)
How to create storage location for MRP area? To create storage location MRP area, do the following steps: 1. Create MRP area by SPRO -> MRP -> Master data -> MRP
area -> Define MRP area.
2. Define scope of planning by tcode OM0E
3. In MM02 assign MRP area in MRP1 view. 4. In SPRO -> Define parallel processing in MRP. 5. While MRP run select parallel processing in the initial
screen.
What exactly is the use of transaction code OM0E? In scope of planning you can define 1. Several plants 2. For One MRP area 3. Plant with MRP area 4. Several MRP area. If you want to run MRP for a plant, you can enter a plant as normal. But if you want to run multiple plant or other option, you have to create scope of planning. So that MRP plan for Multiple plants.