1) When you create a routing,
you can assign it to a group. You combine routings in a group that describe:
A. Similar production processes
for different materials
2) You can link routings and the material to be produced in the following ways: A. A routing can be used to produce
several materials
3) In the routing header you decide followings: A. Whether you want to use inspection
points
4) For each respective step in the operations for the routing you define, A. What the inspection interval
should be between the inspection points
5) On the header level of a routing you define, A. Whether the inspection scope
is dynamically modified
6) You can limit the selection of routing data by entering the following criteria: A. Task list type
7) You can print the following routing objects in addition to operations: A. Long texts for routings or operations
8) You can edit unlocked operations exactly like normal operations in a routing. In particular you can: A. change the data of unlocked operations
9) You have the following possible choices: You replace the reference operation set as followings: A. in one particular routing
10) The following information is contained on the operation overview of the (rate) routing: A. The group of the referenced reference
operation set
--- Correct Answers 1) A, B 2) A, B, C 3) A, B, C 4) A, B, C 5) A, B, C 6) A, B, C, D 7) A, B, C, D 8) A, B 9) A, B 10) A, B, C, D |
|
See also
Get help for your SAP PP Problems
SAP Production Planning Books
SAP PP Tips
Main Index
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
|