Deletion of Measure In Project

How to delete the measure (Project) and to assign a new measure in an appropriation request?

By: Stephen

You can delete the project directly. (This have been simulated in IDES. It works) :

Change Appropriation Request

Assignment of the measure was deleted

Get help for your SAP PS problems
SAP PS Forum - Do you have a SAP PS Question?

SAP Project System Books
SAP PS Books - Certification, Interview Questions and Configuration

SAP Project System Tips
SAP PS Tips and Project System Discussion Forum

Best regards,
SAP Basis, ABAP Programming and Other IMG Stuff
http://www.erpgreat.com

All the site contents are Copyright © www.erpgreat.com and the content authors. All rights reserved.
All product names are trademarks of their respective companies.  The site www.erpgreat.com is in no way affiliated with SAP AG.
Every effort is made to ensure the content integrity.  Information used on this site is at your own risk.
 The content on this site may not be reproduced or redistributed without the express written permission of
www.erpgreat.com or the content authors.