Problem 1: Created a lot of inspection for a material which had not assigned an inspection plan. The status of the lot is CRTD-CHCR-SPRQ. For the material was created an inspection plan, but efforts to change the lot does not determine that the inspection plan, delivering the message "No inspection plan could be found." What can be done? Delete the lot and create again? Resolution: Check the key date on the inspection lot. (QA02). Make sure it is the current date. It must be later then the date you created the plan on. Other things to check if that doesn't work: - On the spec page of the lot look at what type of usage the lot is asking for. Make sure the plan you created has the same usage. - Make sure the plan is released and double check that the material is assigned to the plan. - Make sure the UOM in the plan is the same UOM as the material in the lot. - Make sure there are not any quantity limitations in the plan. (rare, not a lot of places change inspection plans based on inspection lot sizes) . There should be no need to cancel the lot. You just
have to get the various parameters to match up to the plan.
Problem 2: We have more than one inspection plan for a material with same usage. Suppose by mistake, users have assigned wrong inspection plan. How can we change that assigned inspection plan and again assigned correct inspection plan? We are using both inspection type 03 and 89. Resolution: For type 03 - In process inspection, it will read the routing not inspection plan, so there will be no worry. For type 89 - If you have to reassign the correct task list then do: 1. QA02 - Cancel the assignment (Inspection Lot--> Function --> Withdraw Approval). 2. QAC3 - Cancel the samples (If required as per your process design). Then Go to QA02 again and assign the correct one. Follow this process, it will surely help.
Have a SAP QM Problems?
SAP QM Books
SAP QM Tips
Best regards,
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
|