|
Determine whether this statement
is true or false.
1. Dynamic modification is possible at inspection lot creation or when making the usage decision. True
2. If the action limits of a quality control chart are violated, the relevant inspection characteristic is rejected. True
3. Quality control charts cannot be used for master inspection characteristics. True
4. The quality score is updated when the usage decision is made. True
5. The quality score has an effect on the vendor evaluation. True
6. Activity confirmations for QM orders are only possible at results recording. True
7. Evaluations are performed with reference to inspection lots or with reference to quality notifications. True
8. The Early Warning System can be used to monitor critical key figures. True
9. A movement of the data to external systems for evaluation purposes is not possible. True
--- Explanation 1. Dynamic modification is possible at inspection lot creation or when making the usage decision. Answer: True Depending on the settings in the dynamic modification rule, dynamic modification takes place at either at inspection lot creation or in the usage decision. 2. If the action limits of a quality control chart are violated, the relevant inspection characteristic is rejected. Answer: True The quality control chart can be used to valuate the inspection characteristic and subsequently ensures the acceptance or rejection of the characteristic. 3. Quality control charts cannot be used for master inspection characteristics. Answer: False The SPC criteria define how the control chart is used. For example, a control chart can be created for the combination characteristic/material or for the master inspection characteristic. 4. The quality score is updated when the usage decision is made. Answer: True The procedure for the calculation of the quality score is defined in the inspection type in the material. The score is updated when the usage decision is made. 5. The quality score has an effect on the vendor evaluation. Answer: True In addition to the quality score, quality notifications can also have an effect on the vendor evaluation. 6. Activity confirmations for QM orders are only possible at results recording. Answer: False Activities can also be recorded in theQMorder when making the usage decision. 7. Evaluations are performed with reference to inspection lots or with reference to quality notifications. Answer: True This is true. Different InfoStructures are available for the standard analyses. 8. The Early Warning System can be used to monitor critical key figures. Answer: True Using the Early Warning System, the key figures on the InfoStructures can be monitored periodically. 9. A movement of the data to external systems for evaluation purposes is not possible. Answer: False The data can be moved to external statistical programs
using the statistics interface QM-STI.
|
|
Also read
Have a SAP QM Problems?
SAP QM Books
SAP QM Tips
Main Index
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
|