I wanted to do MRP setting for
ERSA material type and not other material types.
How and what are the configuration and the setting has to be done for this? Suggestion: If you want material to be considered for production planning, then you need to configure for MRP type, controller, procurement type should be 'F', availability check, (BOM explosion parameters and production version if it is involved repetitive manufacturing). Yes, you can run MRP only for ERSA.
Before configuring any material types (for your case ERSA material type ), you must know following:
a) Activating MRP and Planning File Entry SAP Transaction code OMDU and the SAP path is Logistics -> Production -> MRP -> Planning File Entry -> Activate MRP and Set up Planning File b) SAP MRP Plant Level MRP Parameters Configuration Transaction code OPPQ and SAP path is Logistics -> Production -> Material Requirement Planning -> Plant Parameters -> Carry out Overall Maintenance of Plant Parameters c) SAP MRP, MRP Group Level Parameters Configuration Transaction code OPPR or the transaction path Logistics -> Production -> MRP -> MRP Groups d) Configuring SAP MRP Types = Use the Standard Functionality e) Configuring SAP MRP Scope of Planning for the Total Planning Run Transaction code OM0E and SAP path SAP Customizing Implementation Guide -> Production -> MRP -> Planning -> Define Scope of Planning for Total Planning, can be used to configure f) Configuring SAP MRP Planning time fence and Roll Forward Period SAP Customizing Implementation Guide -> Production -> Material Requirements Planning -> Planning -> MRP Areas -> MRP Calculation -> Define Planning Time Fence and Roll Forward Period g) Configuring SAP MRP Areas Use the transaction path: SAP Customizing Implementation Guide -> Production -> Material Requirements Planning -> Master Data -> MRP Areas -> Activate MRP for MRP Areas h) SAP MRP Dynamic Safety Stock (Range of coverage Profile) SAP Customizing Implementation Guide -> Production -> Material Requirements Planning -> Planning -> MRP Calculations -> Define Range of Coverage Profile (Dynamic Safety Stock) i) Configuring SAP MRP Days’ Supply and Receipt Days’ Supply SAP Customizing Implementation Guide -> Production -> Material Requirements Planning -> Evaluations -> Define Receipt Elements for Receipt Day’s Supply And maintain the settings in MRP 1,2,3 and 4 as per the requirement for the materials |
|
See also
Get help for your SAP PP Problems
SAP Production Planning Books
SAP PP Tips
Main Index
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
|