Business Example Assumption

Only selected vendors is to be used for the external procurement of materials.  At goods receipt, the quality certificate is to be checked and samples of the goods are to be inspected. Any defects or problems are to be recorded and the solution is to be documented.

QM in Procurement

In procurement, the SAP QM component has functions for managing, controlling, and processing the following objects, based on:

  • Material
  • Material and vendor
  • Vendor and manufacturer


QM Task in Procurement

  • Processes the evaluation, release and selection of vendors (for example, release of a vendor for specific quantities, for a specific period, for a material).
  • Manages quality documents (for example, technical delivery terms).
  • Controls whether a source inspection or a goods receipt inspection is to take place.
  • Processes complaints against a vendor.


QM is integrated in different stages of the procurement chain (when procuring required materials).

You define automatic decision-making criteria to ensure that your company receives high-quality goods (for example, vendor evaluation, goods receipt inspection). If, for example, vendors goods are blocked as a result of poor quality, the system does not propose these vendors and marks them as blocked. In addition, the inspection scope can be controlled using dynamic modification, based on the quality of the delivered goods.

The quality information record procurement contains data relating to the vendor release, certificate control, certification and quality assurance agreements.

You can use a vendor/manufacturer release to ensure that a vendor only delivers goods from a specific manufacturer.

You define a certificate requirement for a material, by using an indicator in the material master.

QM at goods receipt controls, for example, whether:

  • The goods are posted to inspection stock.
  • Inspection lots are created at goods receipt.
  • The delivery or invoice is to be blocked as a result of a complaint (such as a missing certificate).
---

Self-Knowledge Review

Determine whether this statement is true or false.

1. The quality info record contains data for certificate control at goods receipt.

True
False

2. QM cannot be used to set a payment block for the goods receipt invoice.

True
False

3. You do not have to perform a goods receipt inspection for goods coming from certified vendors.

True
False

--- 

Answers

1. The quality info record contains data for certificate control at goods receipt.

Answer: True

Depending on the material and vendor in question, the quality info record can be used define how the goods receipt certificates are to be processed.

2. QM cannot be used to set a payment block for the goods receipt invoice.

Answer: False

If QM in procurement is activated, goods receipt invoices can be blocked until the corresponding quality inspection is completed.

3. You do not have to perform a goods receipt inspection for goods coming from certified vendors.

Answer: True 

SAP QM Tips

Also read
Check List For Simple SAP QM Configuration

Have a SAP QM Problems?
SAP QM Forum - Do you have a SAP QM Question?

SAP QM Books
SAP Quality Management Certification, Interview Questions and Configuration Reference Books

SAP QM Tips
SAP QM Tips and Quality Management Discussion Forum

Main Index
SAP ERP Modules, Basis, ABAP and Other IMG Stuff

All the site contents are Copyright © www.erpgreat.com and the content authors. All rights reserved.
All product names are trademarks of their respective companies.  The site www.erpgreat.com is in no way affiliated with SAP AG. 
Every effort is made to ensure the content integrity. Information used on this site is at your own risk. 
 The content on this site may not be reproduced or redistributed without the express written permission of 
www.erpgreat.com or the content authors.