The following are
some SAP Quality Inspection self knowledge testing questions and answers.
1. The status of the inspection lot informs you about
the current "processing status" of the inspection lot.
True
2. At inspection lot creation, the inspection specifications
are copied into the inspection lot.
True
3. The inspection specifications from the routing cannot
be altered.
True
4. The inspection specifications from the task list
cannot be altered.
True
5. In addition to inspection results recording for
characteristics, it is also possible to record defects.
True
6. Inspection results can also be recorded on the Internet.
True
7. At inspection completion in the usage decision,
the quality level is always updated.
True
8. It is not possible to use a digital signature in
the usage decision.
True
9. The number of physical samples is defined in the
sample-drawing procedure.
True
10. Only specifications for the primary sample can
be specified in the sample-drawing item.
True
11 An inspection process can consist of planned and
unplanned physical samples.
True
--- Suggested Answers 1. Answer: True The inspection lot status shows you what has already been
done using a particular inspection lot (for example, inspection results
have been
2. Answer: True The task list (for example, inspection plan, routing, master recipe) is copied into the inspection lot. 3. Answer: False The inspection specifications can be altered, for example, in accordance with the specifications from variant configuration. 4. Answer: False The inspection specifications can be altered, for example, in accordance with the specifications from batch determination. 5. Answer: True Defects recording for an inspection lot is always possible. 6. Answer: True The service QEW01 is available for inspection results recording using the Internet. 7. Answer: False The system only updates the quality level if you are working with dynamic modification. 8. Answer: False It is possible to work with digital signatures in both inspection results recording and in the usage decision. It depends on the settings in the material. 9. Answer: False The number of physical samples is defined in the sample-drawing item. Several sample-drawing items can exist for one sample-drawing procedure. 10. Answer: False In addition to specifications for the number of primary samples, you can also make specifications regarding the number of pooled samples and reserve samples. 11. Answer: True In addition to the physical samples that are already planned, you can also create unplanned physical samples if required. |
|